Search
Leave a Message
Thank you for your message. I will be in touch with you shortly.
Explore Properties

Property Description

Discover the charm of this stunning Woodward plan nestled in the desirable Oakfield community on Johns Island. Boasting 4 br and 3.5 baths, this home is perfect for both elegant entertaining and everyday family life. Step inside to find an open layout with tray ceilings, cozy study and a beautiful kitchen - perfect gatherings around the large island. Upstairs, the loft offers a great space to movie nights, homework stations or video games. Lots of outdoor living with a charming front porch complete with a swing and the back screened porch overlooking the serene pond perfect for wildlife watching. Enjoy the amazing community amenities including walking paths and pool. Don't miss this opportunity to be minutes to restaurants, shopping and Folly and Kiawah beaches.

Overview

Property Status
Sold
Date Sold
October 24, 2025
Lot Size
7,840.8 Sq.Ft.
MLS ID
25021974
Property Type
Residential
Year Built
2018

Features & Amenities

Total Area
3,242 Sq.Ft.
Neighborhood
Johns Island
Architecture Styles
Colonial
Water Frontage
Pond
Stories
2
Garage Spaces
2.0
Water Source
Public
Utilities
Berkeley Elect Co-Op, Dominion Energy, John IS Water Co
Roof
Architectural
Lot Features
0 - 5 Acre, Level
Parking
2 Car Garage, Garage Door Opener
Heat Type
Natural Gas
Air Conditioning
Central Air
Laundry Room
Laundry Room
Fireplace
Living Room, One
Other Interior Features
Ceiling - Smooth, Tray Ceiling(s), Garden Tub/Shower, Kitchen Island, Walk-In Closet(s), Ceiling Fan(s), Eat-in Kitchen, Family, Formal Living, Loft, Office, Pantry
Sewer
Public Sewer
Substructure
Slab
Other Exterior Features
Rain Gutters
Elementary School
Johns Island Elementary
Middle School
Haut Gap
High School
St. Johns
Sales Price
$758,000

Downloads

2916 Gantt Dr Drive

Schedule a Tour

I would love to help you see this beautiful home! As a full-service brokerage, I can help you tour. Please submit an offer, and answer questions about the buying process.

Thank you

for your interest in 2916 Gantt Dr Drive, Johns Island, SC 29455

2916 Gantt Dr Drive
Navigate
 
Southern Living Idea House in Kiawah River

Explore Johns Island

read more

Featured & Sold Listings

Featured Properties

  • Wooden Cole Island sign in front of a raised cabin surrounded by trees. For Sale

    $6,500,000

    0 Cole, Folly Beach, SC 29439

  • White two-story house with a metal roof, broad covered porch, and covered drive. Sold

    $5,500,000

    5315 Frisco Lane, Johns Island, SC 29455

    • 6 Beds
    • 6 Baths
    • 3,926 Sq.Ft.
  • Aerial view of a wooded 31-acre parcel outlined in yellow beside a golf course. Active Under Contract

    $5,200,000

    0 Hitching Post Lane, Summerville, SC 29483

  • Plywood-sheathed two-story house under construction with open window openings and building materials outside. For Sale

    $4,150,000

    651 Mccants Drive, Mount Pleasant, SC 29464

    • 4 Beds
    • 4 Baths
    • 3,303 Sq.Ft.
  • Oceanfront pool with floating rings, pink umbrellas, and lounge chairs on a sunny day. Active Under Contract

    $3,395,000

    603 E Arctic Avenue, Folly Beach, SC 29439

    • 6 Beds
    • 6 Baths
    • 3,456 Sq.Ft.
  • Cream coastal home with twin gables, broad porches, central staircase, palm trees, and flags. For Sale

    $3,195,000

    601 Palmetto Boulevard, Edisto Island, SC 29438

    • 4 Beds
    • 4 Baths
    • 3,764 Sq.Ft.
  • 67 Delahow Street For Sale

    $3,175,000

    67 Delahow Street, Daniel Island, SC 29492

    • 4 Beds
    • 6 Baths
    • 4,493 Sq.Ft.
  • Elevated pale green coastal home with broad windows, a raised deck, and a long walkway. Sold

    $3,095,000

    313 E Arctic Avenue, Folly Beach, SC 29439

    • 3 Beds
    • 3 Baths
    • 2,290 Sq.Ft.
  • Large light-sided home with a metal roof, dark shutters, and a broad front staircase. For Sale

    $2,999,999

    Private Address

    • 5 Beds
    • 6 Baths
    • 3,760 Sq.Ft.
  • Two-story house rendering with multiple gabled roofs and broad covered porches. Sold

    $2,950,000

    1408 Jackson Street, Mount Pleasant, SC 29464

    • 4 Beds
    • 4 Baths
    • 4,012 Sq.Ft.
  • Aerial view of a wooded waterfront neighborhood, harbor, and cable-stayed bridge with a red location pin. Sold

    $2,914,500

    528 Wampler Drive, Charleston, SC 29412

    • 4 Beds
    • 3 Baths
    • 2,793 Sq.Ft.
  • White coastal house with dark lower siding, multiple garage doors, and palm trees along the front. Sold

    $2,885,000

    503 E Arctic Avenue, Folly Beach, SC 29439

    • 4 Beds
    • 4 Baths
    • 3,445 Sq.Ft.
  • Aerial view of two vacant E Ashley Avenue lots outlined in yellow beside a sandy beach. Sold

    $2,837,500

    1599&1601 E Ashley Avenue, Folly Beach, SC 29439

  • Aerial view of a waterfront dock and covered pavilion beside marshland and neighboring homes. Sold

    $2,831,500

    1063 Mainsail Court, Awendaw, SC 29429

    • 5 Beds
    • 5 Baths
    • 3,540 Sq.Ft.
  • Gray-sided home with a warmly lit entrance beneath sprawling oak trees at dusk. Sold

    $2,825,000

    422 Palm Street, Mount Pleasant, SC 29464

    • 5 Beds
    • 5 Baths
    • 3,600 Sq.Ft.
  • Pale yellow two-story home with double porches, framed by mature trees and a curving driveway. Sold

    $2,770,000

    392 Tombee Court, Mount Pleasant, SC 29464

    • 5 Beds
    • 5 Baths
    • 4,700 Sq.Ft.
  • Gray-shingle home with twin upper gables, broad front stairs, landscaped yard and an American flag. Sold

    $2,750,000

    3320 Hopkinson Plantation Road, Johns Island, SC 29455

    • 5 Beds
    • 6 Baths
    • 6,126 Sq.Ft.
  • Large light-colored home with a metal roof, covered porch, brick steps, and palm trees along the lawn. Sold

    $2,725,000

    4215 Ten Shillings Way, Ravenel, SC 29470

    • 4 Beds
    • 5 Baths
    • 4,544 Sq.Ft.
  • Covered porch with white rocking chairs overlooking a marsh and tidal creek. Active Under Contract

    $2,700,000

    1214 Tabby Drive, Folly Beach, SC 29439

    • 5 Beds
    • 5 Baths
    • 3,170 Sq.Ft.
  • Beach house at 911 E Arctic Avenue, raised above sandy dunes with a wooden boardwalk. Active Under Contract

    $2,700,000

    911 E Arctic Avenue, Folly Beach, SC 29439

    • 6 Beds
    • 4 Baths
    • 2,563 Sq.Ft.
  • Blue raised coastal house with palm trees, dark shutters, and a covered driveway. Sold

    $2,675,000

    513 E Arctic Avenue, Folly Beach, SC 29439

    • 4 Beds
    • 3 Baths
    • 2,318 Sq.Ft.
  • Beige two-story home with broad entry stairs, palm trees, and a lawn. Sold

    $2,500,000

    2480 Royal Oak Drive, Johns Island, SC 29455

    • 4 Beds
    • 4 Baths
    • 3,278 Sq.Ft.
  • Raised coastal home with a metal roof, two-level deck, and fenced swimming pool. Sold

    $2,450,000

    1306 Palmetto Boulevard, Edisto Beach, SC 29438

    • 6 Beds
    • 5 Baths
    • 2,120 Sq.Ft.
  • Coastal home surrounded by palms, with tidal marsh and ocean beyond. For Sale

    $2,450,000

    618 Flowers Drive, Edisto Island, SC 29438

    • 2 Beds
    • 3 Baths
    • 2,550 Sq.Ft.
  • Elevated two-story home with a broad columned porch, brick arches, and landscaped lawn framed by mature trees. Sold

    $2,351,000

    1857 Headquarters Plantation Drive, Johns Island, SC 29455

    • 5 Beds
    • 6 Baths
    • 4,551 Sq.Ft.
  • Backyard with Adirondack chairs around a stone fire pit beneath a sprawling oak beside a marsh. For Sale

    $2,345,000

    1670 Hunley Avenue, Charleston, SC 29412

    • 3 Beds
    • 2 Baths
    • 2,964 Sq.Ft.
  • Dark-sided raised house with a two-car garage, white-trimmed porch, and mature palms. Sold

    $2,250,000

    731 Virginia Rail Road, Kiawah Island, SC 29455

    • 3 Beds
    • 4 Baths
    • 2,733 Sq.Ft.
  • Red-brick home with four garage doors, a raised central entrance, and palm trees. Sold

    $2,250,000

    766 Clearview Drive, Charleston, SC 29412

    • 3 Beds
    • 2 Baths
    • 2,812 Sq.Ft.
  • White multi-story house with pale green shutters and a black metal gate. Sold

    $2,050,000

    179 Wentworth Street, Charleston, SC 29401

    • 3 Beds
    • 4 Baths
    • 2,210 Sq.Ft.
  • Raised light-blue coastal home with white wraparound porches, palm trees, and a ground-level parking area. Sold

    $2,050,000

    74 Sandbar Lane, Folly Beach, SC 29439

    • 5 Beds
    • 5 Baths
    • 2,833 Sq.Ft.
  • Aerial view of tidal marsh waterways, wooded shoreline, and a waterfront home marked by a pin. Sold

    $2,030,000

    1102 Down Under Lane, Edisto Island, SC 29438

    • 5 Beds
    • 5 Baths
    • 2,907 Sq.Ft.
  • Pale blue two-story home with wraparound porches, palm trees, and a curved driveway. Sold

    $2,000,000

    1853 Headquarters Plantation Drive, Johns Island, SC 29455

    • 5 Beds
    • 4 Baths
    • 3,950 Sq.Ft.
  • White raised two-story home with a broad covered porch, exterior stairs, and landscaped lawn. Sold

    $2,000,000

    827 Robert E Lee Boulevard, Charleston, SC 29412

    • 5 Beds
    • 5 Baths
    • 4,601 Sq.Ft.
  • Aerial view of a two-story home beside a marsh, with a long dock extending into the water. For Sale

    $1,995,000

    8176 Rosa Scott Road, Edisto Island, SC 29438

    • 4 Beds
    • 5 Baths
    • 3,948 Sq.Ft.
  • White two-story home with black shutters, central staircase, twin garages, and a large live oak. Sold

    $1,940,000

    1145 Hills Plantation Drive, Charleston, SC 29412

    • 5 Beds
    • 4 Baths
    • 3,224 Sq.Ft.
  • White two-story home with a broad raised porch and glowing windows beneath a pink dusk sky. Sold

    $1,900,000

    1544 John Fenwick Lane, Johns Island, SC 29455

    • 4 Beds
    • 5 Baths
    • 3,203 Sq.Ft.
  • White clapboard house with a teal door, framed by a flowering magnolia and leafy garden. Sold

    $1,900,000

    244 Ashley Avenue, Charleston, SC 29403

    • 3 Beds
    • 3 Baths
    • 2,084 Sq.Ft.
  • Aerial view of a wooded parcel outlined in yellow beside a road and commercial parking lot. For Sale

    $1,895,000

    0 Folly Road, Charleston, SC 29412

  • Blue two-story home on a broad lawn beside a coastal marsh and waterway. For Sale

    $1,850,000

    1636 Wharf Ferry Road, Edisto Island, SC 29438

    • 3 Beds
    • 3 Baths
    • 2,186 Sq.Ft.
  • Wood-sided home with a peaked roof and front stairs beneath mature trees and palms. Sold

    $1,850,000

    453 Sea Rocket Court, Kiawah Island, SC 29455

    • 3 Beds
    • 2 Baths
    • 1,355 Sq.Ft.
  • Modern coastal home at dusk with a raised deck, exterior stairs, palm trees, and a stepping-stone lawn path. Sold

    $1,840,000

    2363 Palmer Creek Bend, Charleston, SC 29412

    • 3 Beds
    • 4 Baths
    • 2,689 Sq.Ft.
  • Coastal homes beside a sandy beach, with a rock seawall and marshland beyond. For Sale

    $1,800,000

    1735 E Ashley Avenue, Folly Beach, SC 29439

  • Raised Southern-style home with red roof and front door, broad staircase, and moss-draped oak trees. Sold

    $1,800,000

    1871 Headquarters Plantation Drive, Johns Island, SC 29455

    • 4 Beds
    • 4 Baths
    • 3,119 Sq.Ft.
  • Tidal marsh waterfront with long boardwalks and a covered dock beside a tree-lined shore. Sold

    $1,800,000

    1988 Long Creek Road, Wadmalaw Island, SC 29487

    • 3 Beds
    • 3 Baths
    • 2,560 Sq.Ft.
  • Covered front porch with white rocking chairs, a wreath-adorned wooden door, and autumn pumpkins. Sold

    $1,795,000

    2196 Coker Avenue, Charleston, SC 29412

    • 4 Beds
    • 4 Baths
    • 3,432 Sq.Ft.
  • Raised coastal-style house with a wide covered porch, wooden stairs, and flower baskets. Sold

    $1,775,000

    1692 Wharf Ferry Road, Edisto Island, SC 29438

    • 3 Beds
    • 4 Baths
    • 3,075 Sq.Ft.
  • Aerial view of a coastal home marked by an arrow, with ocean, marsh, and boardwalk nearby. Sold

    $1,775,000

    68 W 9th Street # B, Folly Beach, SC 29439

    • 3 Beds
    • 4 Baths
    • 2,234 Sq.Ft.
  • Two-story pale blue house with white trim, a covered porch, and prominent exterior stairs. Active Under Contract

    $1,750,000

    1585 John Fenwick Lane, Johns Island, SC 29455

    • 4 Beds
    • 5 Baths
    • 3,502 Sq.Ft.
  • Coastal salt marsh with tall grasses, a narrow waterway, and a distant tree line. Active Under Contract

    $1,750,000

    2017 Paul Chavis Lane, Charleston, SC 29412

  • Newly built single-story house with a gabled roof on a broad lawn beside mature trees. For Sale

    $1,750,000

    5022 Farm Retreat Road, Johns Island, SC 29455

    • 4 Beds
    • 4 Baths
    • 3,609 Sq.Ft.
View All

Follow Us On Instagram